Sprinkler pumps and controls dimensioned for the task

Sprinkler pumps and controls dimensioned for the task

Wirebach supplies sprinkler pumps and controls for systems where it is crucial that the technology functions correctly in case of fire. We assist installers and consultants in translating project requirements into a solution that fits the specific building.

Pressure, flow, and operational reliability must be integrated

When the pressure and flow requirements are known, it's not about choosing a standard pump off the shelf. It's about getting a solution delivered that precisely fits the system, the building, and the requirements the project is built around.

Wirebach supplies sprinkler pumps and controls for systems where operational reliability and correct dimensioning are not left to guesswork.

We help translate project requirements into the right technical package. This means we don't just look at the pump itself, but also at the control, startup, and overall function, so the system can react correctly when needed.

Fire pumps are critical components that must be able to start automatically and deliver the necessary water pressure during a fire. This makes correct selection and installation a real business decision – not just a line item.

Contact Wirebach
Case: FTZ

Case: FTZ

For FTZ’s enormous central warehouse in Aarhus, we delivered one of the country's most powerful solutions: Three massive diesel pumps with a capacity of 10,000 litres per minute at 10 bar. By choosing Wirebach, the client received a redundant solution that protects their vital storage capacity around the clock.

Self-developed control panels that monitor everything from oil pressure to engine temperatures and ensure the system starts immediately.

Jockey pumps: Small units that maintain the correct pressure in the pipe system and prevent unnecessary wear and tear on the main pumps.

Transparent documentation: All data and diagrams are easily accessible via the unique installation number.

Do you have a project with known pressure and flow requirements? Send your data to Wirebach, and we will find the pump and control solution that fits the task.

Nicolaj Osther

Nicolaj Osther

Sales Manager

+45 40 71 57 39 E-mail

Many projects select their pumps too late in the process.

When the solution is only concretised late in the process, there is less room for optimisation, fewer
opportunities to correct errors, and a greater risk of ending up with a solution that
technically works, but in practice is heavier, more expensive, or more cumbersome than necessary.

In addition, installers and consultants often find that standard requirements and design need to be translated into something that can actually be delivered and function stably in practice.



Pumps for both smaller and larger systems

The need for pump capacity depends on the building's use and risk class. A nursing home or hotel typically has different needs than a warehouse with a high fire load.

Wirebach delivers solutions including electric pumps, diesel pumps, and jockey pumps. For smaller systems, an electric pump and a diesel pump are often used, while larger systems may require multiple diesel pumps or other redundant solutions.

Common to all systems is that they must be able to start automatically and deliver the necessary water pressure when the sprinkler system is activated.

Why partner with Wirebach

Choose Wirebach when you want more than just a pump delivery. You choose Wirebach to gain a collaborative partner who understands the requirements behind the solution, knows the market
and can advise on dimensioning, control, and practical application. This is especially valuable in projects where the correct solution from the outset is more important than
choosing the cheapest component on paper.

Contact Wirebach

Frequently Asked Questions

What is the delivery time?

Typically 5-8 weeks for pump deliveries and 10-14 weeks for complete pump stations.

Can you deliver to FM standards?

Yes, we have in-depth knowledge of both Danish DBI regulations and American FM standards

When should we order?

We recommend early involvement to avoid the typical "rush" at the end of the construction process.